Skip to content

Suite 3C, 68 Oxford Street, Collingwood VIC 3066

+61 3 8415 1588 / d3@detail3.com

Enquire with us

Get in touch

    Swan Street Bridge

    Swan Street Richmond

    Project client

    VicRoads

    Our Role

    Construction documentation, Landscaping documentation, and lighting plan

    Value

    $30 million

    Sector

    Infrastructure

    Builder

    Seymour Whyte

    Images

    TBC

    The bridge upgrade was seen as an opportunity by VicRoads, to improve congestion and traffic flow on this significant link between Melbourne’s CBD and the inner-east suburbs. The new design enhances the surrounding urban design, as well as the sporting and cultural history of the area, and improves not only vehicular access, but benefits cyclists, motorists, and pedestrians too. The bridge has added an additional lane for car traffic and a 4m wide cantilevered shared user path to either side of the bridge, for pedestrians and cyclists.

    The bridge was designed by Melbourne based, BKK Architects, who engaged Detail 3 for design development and documentation assistance. Further into the project, Detail 3 was engaged by the builder directly, to continue with further documentation of the landscaping, lighting plan, and Urban design. The bridge and its surrounding landscaping is estimated for completion by February 2019.

    Let's
    work
    together

      Detail3 Instagram @detail_3_